Sale!

Latest Pakistani Fashion Pink Pishwas

Original price was: $ 1,687.Current price is: $ 1,181.

Article Three Quarter Sleeves Long Length is artistically coordinated with Churidar Pajama and comes with dupatta.
EventNikah, Muslim Marriage Function, Muslim Wedding, Bridal Registry or Nikah of Bride.
Hand Embroidery Vintage Shades of Embroidery
Other Styles Fit and Flare, Pleats,
Colours Deep Pink,
Fabrics Pure Chiffon,
NecklineEmbellished Neckline,
SleevesThree Quarter Sleeves,
Dress Code 477

Top: Pink pure chiffon Anarkali outfit is fully embellished with beautiful floral and ornamental hand embroidery on the neck, sleeves, and bottom of the pishwas.  Pink pishwas have a high collar and pleated-on waistline scallops on the bottom and pishwas are fully lined with pure silk.

Trouser/shalwar: Pink pure Crepe Silk trousers.
Embellishment work includes gota work, cut work, kamdani, and crystal embroidered thread mostly using silver and dull golden.


Consultation & Customisation

If you would like to buy this outfit please fill the below form with your requirements. Our designer will be back to you with all the information.
  1. (required)
  2. (required)
 

Make an Appointment

You can view the samples in Liverpool, Sydney, Australia. Please book an appointment via WhatsApp+441212884400 or email at sales@deemasfashion.com.au

Dress Care Instructions
  • Do not wash.
  • Do not bleach.
  • Do not tumble dry.
  • Iron at a maximum sole-plate temperature of 110C.
  • Mild professional dry cleaning in hydrocarbons.
  • We recommend you take special care of this garment.
Sizes Available
Made to Measure. We will make this dress according to your requirements and measurements. We can add sleeves and change the colour of any dress. We do not charge extra for PLUS SIZES.

Time Frame
Normally we take 15-35 working days for Casual and formal wear dresses (25-65 working days for heavy & bridal dresses). For urgent delivery please contact us.

Step by Step Pictures While Dress Making
We offer step by step pictures of dress making (from dying till finishing) so you can change anything you like. This facility takes extra 15 days but really suitable for heavy dresses.